Bathroom remodeling

For this master bathroom we replaced the entire tub and shower surrounding. Replaced the toilet and added new tiling and trim. The powder room of the bathroom had carpeting that was replaced with tile. The plumbing for the sink was replaced to allow for a double sink. A new cabinet and marble counter top was added. Finally we replaced light fixtures and repainted.

First Floor Renovation

The first floor of a townhome saw remodeling to the mud room, kitchen, dining and living room. The carpet was ripped out and replaced with laminate wood flooring. Dry wall was replaced in some areas and all walls repainted. Entire kitchen redone including cabinets and appliances. Mud room saw new cabinets installed, shelving and a mini fridge. Trim and stairwell redone, front door repainted.

Bedroom repairs

3 bedrooms are touched up with new carpeting, blinds, and trim. Installed new light fixtures and repainted the dry wall.

Deck replacement

Removed wooden deck and replaced with new composite decking and aluminum railings.

Deck replacement

Removed wooden deck and replaced with new composite decking and aluminum railings with solar light caps.